U.S. flag   An official website of the United States government
Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock (Dot gov) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Search Results (Refine Search)

Search Parameters:
  • Results Type: Overview
  • Keyword (text search): cpe:2.3:a:oracle:primavera_p6_professional_project_management:16.2:*:*:*:*:*:*:*
  • CPE Name Search: true
There are 1 matching records.
Displaying matches 1 through 1.
Vuln ID Summary CVSS Severity
CVE-2018-0734

The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.0.2q (Affected 1.0.2-1.0.2p).

Published: October 30, 2018; 8:29:00 AM -0400
V3.0: 5.9 MEDIUM
V2.0: 4.3 MEDIUM