U.S. flag   An official website of the United States government
Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Https

Secure .gov websites use HTTPS
A lock (Dot gov) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

Search Results (Refine Search)

Search Parameters:
  • Keyword (text search): cpe:2.3:a:oracle:primavera_p6_enterprise_project_portfolio_management:18.8.19.0:*:*:*:*:*:*:*
  • CPE Name Search: true
There are 8 matching records.
Displaying matches 1 through 8.
Vuln ID Summary CVSS Severity
CVE-2020-36518

jackson-databind before 2.13.0 allows a Java StackOverflow exception and denial of service via a large depth of nested objects.

Published: March 11, 2022; 2:15:07 AM -0500
V4.0:(not available)
V3.1: 7.5 HIGH
V2.0: 5.0 MEDIUM
CVE-2021-2366

Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 and 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 6.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:C/C:L/I:L/A:N).

Published: July 21, 2021; 11:15:29 AM -0400
V4.0:(not available)
V3.x:(not available)
V2.0: 5.5 MEDIUM
CVE-2021-2351

Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H).

Published: July 21, 2021; 11:15:21 AM -0400
V4.0:(not available)
V3.x:(not available)
V2.0: 5.1 MEDIUM
CVE-2020-5421

In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter.

Published: September 19, 2020; 12:15:11 AM -0400
V4.0:(not available)
V3.1: 6.5 MEDIUM
V2.0: 3.6 LOW
CVE-2020-14706

Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19.12.5. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.9 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:U/C:H/I:L/A:N).

Published: July 15, 2020; 2:15:34 PM -0400
V4.0:(not available)
V3.1: 5.9 MEDIUM
V2.0: 4.0 MEDIUM
CVE-2020-10683

dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavior in any application that uses dom4j.

Published: May 01, 2020; 3:15:12 PM -0400
V4.0:(not available)
V3.1: 9.8 CRITICAL
V2.0: 7.5 HIGH
CVE-2019-10219

A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.

Published: November 08, 2019; 10:15:11 AM -0500
V4.0:(not available)
V3.1: 6.1 MEDIUM
V2.0: 4.3 MEDIUM
CVE-2018-1000632

dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear to be exploitable via an attacker specifying attributes or elements in the XML document. This vulnerability appears to have been fixed in 2.1.1 or later.

Published: August 20, 2018; 3:31:31 PM -0400
V4.0:(not available)
V3.1: 7.5 HIGH
V2.0: 5.0 MEDIUM