Search Results (Refine Search)
- Results Type: Overview
- Keyword (text search): cpe:2.3:a:oracle:primavera_p6_professional_project_management:17.11:*:*:*:*:*:*:*
Vuln ID | Summary | CVSS Severity |
---|---|---|
CVE-2018-0734 |
The OpenSSL DSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.1a (Affected 1.1.1). Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.0.2q (Affected 1.0.2-1.0.2p). Published: October 30, 2018; 8:29:00 AM -0400 |
V3.1: 5.9 MEDIUM V2.0: 4.3 MEDIUM |